W.O. 21-32 Wicks Lane and Bitterroot Drive Stormwater Improvements

OwnerCity of Billings Contract Amount$2,266,135.00 Work PerformedPhase 2 Improvements from Wicks Lane Station 137+80 to the Emma Jean Subdivision storm connection. Construction consists of new 30 to 54-inch diameter storm drain trunk line. Improvements include storm drain and incidental water main installation, asphalt paving, sidewalks, and tree removal. The project is located within Wicks Lane […]

Joplin Wastewater Improvements 2024

OwnerLiberty County Contract Amount$1,572,141.00 Work PerformedThe work included improvements to the Town of Joplin’s Wastewater Collection and Treatment System. The Base Bid collection system improvements consisted of replacing approximately 380-feet of existing 8” clay gravity sewer main with 8” PVC in the alley south of Second Street. The new main was connected to existing manholes […]