St. Marie Water System Improvements

OwnerNorth Valley County Water & Sewer District Contract Amount$1,957,770.00 Work PerformedSchedule One consists of replacing 2,200 linear feet of 8-inch asbestos cement (AC) water main with new 8-inch polyvinyl chloride (PVC) water main, replacing and installing new valves, fire hydrants, and water services up to and including curb stops. Schedule Two consists of replacing 1,740 […]
Town of Wibaux Wastewater Treatment System Upgrades

OwnerTown of Wibaux Contract Amount$3,579,466.00 Work PerformedReconfiguration of the existing facultative lagoon evaporation system to accommodate treatment and storage for a new spray irrigation system along with a new pumping facility, force main, and a center pivot for effluent disposal via spray irrigation. Removal of 354,600 SF of existing lagoon liner and replacement with 60 […]
W.O. 23-01 Contract 2 2023 Sewer Main Replacement

OwnerCity of Billings Contract Amount$3,314,566.10 Work PerformedZone 1: Alleys north and south of Princeton Avenue between Michigan Street and Wisconsin Street. Included 1,180 LF of 8” sanitary sewer main replacement, manholes, service reconnections, and associated work. Zone 2: Portion of Ponderosa Drive south of Poly Drive. Included 360 LF of 8” sanitary sewer main (both […]
Livingston Regional Sewer Extension Project

OwnerCity of Livingston Contract Amount$2,706,194.50 Work PerformedInstallation of 3,688 LF of 4 “ pipe for sewer service lines. Construction of new sewer mains (9,829 LF of 8”, 3,220 LF of 10”), sewer service to each property extended off the main to the property line, bedding material, backfill, dewatering, compaction, sewer testing, asphalt and gravel road […]
Circle Phase 3 Water System Improvements

OwnerTown of Circle Contract Amount$2,696,569.00 Work PerformedSchedule 1 included 1,475 LF of 8” PVC water main that replaced 4” AC. Schedule 2 included 1,275 LF of 8” PVC water main that replaced 6” and 4” CIP and 6” AC. Schedules 1, 2 and 3 included 4 horizontal directional drills of 120 LF each installation of […]
Costco Warehouse

OwnerCostco Wholesale Corporation General ContractorKnife River – Billings Work PerformedThe project consisted of 7,607 LF of 6” to 21” Storm Drain piping, storm drain cleanouts, 800 LF of 24 “and 60” Irrigation, 48” – 84” SD Manholes, 120” SD Manhole Pump Station, (3) Chambered Stormwater Retention Systems, 1,956 LF of 6” – 8” Sanitary Sewer […]
MDT Underpass Ave

OwnerMontana Department of Transportation General ContractorRiverside Contracting, Inc. Contract Amount$2,088,189.50 Work PerformedInstallation of 735 LF PVC Press 16” water, 43 LF PVC Press 12” water, 607 LF 24” storm drain pipe, new stormwater pump station, 1063 LF 18” storm drain pipe, 94 LF 12” storm drain pipe.
South Frontage Road Water & Sewer Extension

OwnerBillings Logistic Center One, LLC Contract Amount$1,258,034.87 Work PerformedInstallation of 3,626 LF of 8” – 12” water line and appurtenances, 320 LF of sewer line, 48” manholes, and asphalt restoration.
W.O. 22-10 Alkali Creek Water and Sewer Extension

OwnerCity of Billings Contract Amount$3,875,064.00 Work PerformedAs an extension of water and sewer service for future development, the project consisted of 3,926 LF of 21” sanitary sewer, fifteen sanitary sewer manholes, two live creek crossings, 3,705 LF of 12” water main and appurtenances, asphalt restoration, and extensive seeding. Not only were unconventional dewatering techniques implemented […]
W.O. 20-01 Phase 2 Sanitary Sewer Interceptor Replacement

OwnerCity of Billings Contract Amount$4,035,345.00 Work PerformedThe project included the installation of 3,304 LF of 48” and 60” FRP sanitary sewer that served as two of the three primary sanitary sewer interceptor lines for the City of Billings. Along with the interceptor installation, the project also included concrete-encased FRP Tee installation that acted as access […]