Owner
City of Billings
Contract Amount
$3,430,112
Work Performed
The project included construction of a 750,000 gallon pre-stressed concrete water tank, including a foundation of drilled piers. It also included demolition of an existing 180,000 gallon bolted steel water tank and sitework including earthwork, ductile iron water main, PVC water main and erosion control measures.