South Frontage Road Water & Sewer Extension

OwnerBillings Logistic Center One, LLC Contract Amount$1,258,034.87 Work PerformedInstallation of 3,626 LF of 8” – 12” water line and appurtenances, 320 LF of sewer line, 48” manholes, and asphalt restoration.
W.O. 22-10 Alkali Creek Water and Sewer Extension

OwnerCity of Billings Contract Amount$3,875,064.00 Work PerformedAs an extension of water and sewer service for future development, the project consisted of 3,926 LF of 21” sanitary sewer, fifteen sanitary sewer manholes, two live creek crossings, 3,705 LF of 12” water main and appurtenances, asphalt restoration, and extensive seeding. Not only were unconventional dewatering techniques implemented […]
W.O. 20-01 Phase 2 Sanitary Sewer Interceptor Replacement

OwnerCity of Billings Contract Amount$4,035,345.00 Work PerformedThe project included the installation of 3,304 LF of 48” and 60” FRP sanitary sewer that served as two of the three primary sanitary sewer interceptor lines for the City of Billings. Along with the interceptor installation, the project also included concrete-encased FRP Tee installation that acted as access […]
RAE Water & Sewer Pipeline and Infiltration Gallery SRF No. C301286

OwnerRAE County Water & Sewer District 313 Contract Amount$2,320,357.00 Work PerformedConstruction of a new rapid infiltration gallery complete with control valving, construction of the force main pipeline, construction of a Controls Building for the rapid infiltration gallery, connection to the existing pipe, pressure testing of existing pipe, modification of existing control valving, and coordination with […]
Briarwood Reservoir Expansion

OwnerCity of Billings Contract Amount$3,430,112 Work PerformedThe project included construction of a 750,000 gallon pre-stressed concrete water tank, including a foundation of drilled piers. It also included demolition of an existing 180,000 gallon bolted steel water tank and sitework including earthwork, ductile iron water main, PVC water main and erosion control measures.
Lockwood Intake & Water Treatment Plant Improvements

Lockwood Water & Sewer District – completed April 2019 Contract Amount$2,450,000 Work PerformedDemolition of existing raw water pumping structure, construction of new raw water pump station building and intake pump tubes, and dewatering. Installation of new raw water pumps, air purge system, station, and piping. Install new water piping including 24″, and buried yard pipe, […]
Thayne Water Storage Project

Thayne WY Oct 2019 Contract Amount$918,314.50 Work PerformedConstruct 300,000 gallon concrete water tank. Installation of 680LF of 10″ HDPE water pipe plus all site work for new road and slope to tank. Work included sandblasting, coating of existing tank, and modification of internal overflow.
W.O. 18-22 Leavens Reservoir Water Line and Improvements

OwnerCity of Billings – completed 8/23/21 Contract Amount$2,073,140.00 Work PerformedSite demolition, reservoir inlet, outlet and overflow pipe work, site piping for second overflow, new inlet/outlet and Zone waterline, construction of a new overflow structure, reservoir baffle wall repairs and other surface repairs, temporary provisions at Willett Reservoir for heating inlet piping.