Owner
Town of Circle
Contract Amount
$2,696,569.00
Work Performed
Schedule 1 included 1,475 LF of 8” PVC water main that replaced 4” AC. Schedule 2 included 1,275 LF of 8” PVC water main that replaced 6” and 4” CIP and 6” AC. Schedules 1, 2 and 3 included 4 horizontal directional drills of 120 LF each installation of 8” carrier pipe. Schedule 6 included 1,100 LF of 8” PVC Water Main.